Surface cladding of boiler tube walls

CMT (Cold Metal Transition Deposition Technology) additive manufacturing is a new type of wire arc additive technology, which has the characteristics of forming complex parts in one go and can achieve free manufacturing of parts. CMT welding technology is a new deposition process developed by Austrian company Fronius, which has the characteristics of high deposition rate, low heat input, precise arc length control, and no spatter. CMT deposition technology mainly uses external mechanical withdrawal force to promote short circuit transition of molten droplets, while improving the waveform of voltage and current. During short circuit transition, the current is almost zero, greatly limiting the welding heat input. CMT deposition digitally coordinates the wire feeding and withdrawal movements with the droplet transition process.

 

Surface melting deposition of membrane wall in garbage incinerator

corrosion mechanism

The garbage incineration boiler uses garbage as fuel, and the heat obtained from its combustion is used for heating or power generation, making garbage energy efficient. Due to the complexity and heterogeneity of garbage components, various highly corrosive media, mainly chlorides and sulfides, are generated during the incineration process. Before starting any project, our company recommends that the owner provide the corresponding burst pipe location for us to make a first-hand analysis report based on the corrosion components of the garbage. Currently, Saiyi Technology has conducted specific research on the corrosion components of garbage in several cities such as Guangzhou, Suzhou, and Foshan. For example, in a certain garbage power plant in Suzhou, the corrosive ash deposition is mainly composed of chloride salts (NaCl), while in a garbage power plant in Foshan, the content of sulfates (mainly potassium and calcium) is higher than that of chloride salts. It is worth mentioning that the heavy metal chloride PbCl2 appears in the corrosive components of Foshan garbage, with a melting point of 498 degrees. The presence of this substance undoubtedly reduces the melting point of salt deposition on the surface of the pipe. In response to this personalized situation, after joint discussions between our technical experts and experts from the Corrosion Center of Beijing University of Science and Technology, we have also provided an optimized anti-corrosion plan.

Most waste incineration power plants mainly contain corrosive substances such as sulfur, chlorine, sodium, potassium, and calcium, as shown in the following figure:

These low melting point ash deposition salts of metal chlorides undergo oxidation-reduction reactions with the oxide film on the metal surface, corroding the substrate; In addition, it will also co deposit with other inorganic salts in the flue gas on the metal surface, forming low melting point eutectic crystals, greatly reducing the melting point of the accumulated ash. A molten corrosive salt will be generated on the high-temperature pipe wall, forming a local liquid phase at the interface between the accumulated ash and metal, forming an electrochemical corrosion atmosphere. The base metal undergoes anodic dissolution, and the two oxidants O2 and Cl2 in the atmosphere are reduced. The base metal is further oxidized and combined with O2- to deposit in the form of loose oxide particles, or combined with Cl - to form chlorides. As corrosion progresses, a loose outer oxide film is formed on the outer surface of the molten chlorides, as shown in the following figure:

Due to the high diffusion rate of metal ions in molten salt, this electrochemical process seriously erodes the metal components of the boiler's water-cooled wall, superheater, and other parts, leading to premature performance degradation, as shown in the following figure:

The entire corrosion mechanism is represented by the chemical formula as follows:

2ZnCl2+2Fe2O3+O2=2ZnFe2O4+2Cl2

2ZnCl2+2Cr2O3+O2=2ZnCr2O4+2Cl2

ZnCl2+1/2O2=ZnO+Cl2

2Fe+3Cl2=2FeCl3

2Cr+3Cl2=2CrCl3

2FeCl3+3/2O2=Fe2O3+3Cl2

2CrCl3+3/2O2=Cr2O3+3Cl2

2MCl+SO3+H2O=M2SO4+2HCl

2NaCl+SO3+O2=Na2SO4+Cl2

As Cl ions continue to replenish, the corrosion reaction continues, and the simultaneous presence of sulfides accelerates the entire corrosion rate. Corrosion is a complex process involving multiphase interactions of gas, liquid, and solid. However, after a period of boiler operation, the surface of the pipe wall will be covered by accumulated dust. On the one hand, the accumulated dust will separate some of the gas and directly react with the pipe wall. On the other hand, the corrosive medium in the gas will react with the accumulated dust, and then the accumulated dust will react with the pipe wall. The entire conduction process forms a complete corrosion chain. This corrosion has become a limiting factor for further improving the conversion efficiency of waste to electricity and heat, seriously affecting the safe operation of waste incineration boilers.

 

Surface deposition of four tubes in a coal powder furnace

The deposition standard shall be executed in accordance with the Technical Specification for Anti Wear Spray Coating of Heating Surface of Circulating Fluidized Bed Boilers - DL/T 1595-2016. The welding process needs to ensure that the base material of the pipe does not undergo any material changes, does not generate stress, and the pipeline does not deform. The fusion alloy layer is tightly bonded with the base material of the pipe, with a fusion thickness of generally 1.5-2.5mm. It is necessary to ensure that there is no delamination, detachment, good heat conduction, smooth surface, and no ash hanging at high temperatures. After melting, the pipe has good wear resistance, high-speed erosion resistance, and resistance to cold and heat shock. The minimum hardness of the surface alloy layer after fusion reaches HRC40-50. When the operating temperature in the furnace is between 850 ℃ and 1000 ℃, the fusion layer does not oxidize, delaminate, and the material does not change. The surface of the deposited layer should be uniform and fully covered, without any leakage or exposure of the base material; There must be no group holes or deep pits, and repairs must be carried out when group holes or deep pits appear; No peeling, bulging, coarse particles, chipping, or other defects that affect the use of the coating are allowed. The upper transition area of the fusion layer needs to be polished and repaired, and the height of the transition area should not be less than 60mm. According to the current normal operating conditions, the service life of the deposited layer needs to ensure that there is no occurrence of base material wear, leakage, or pipe explosion in the water-cooled wall pipe wear area for 5 years.

Prev:Application of WRP wear-resistant plate

Next: Application of alloy powders
share to
Back to List

CONTACT US

Committed to becoming a leader in China's high-performance functional materials technology
CONTACT US
主站蜘蛛池模板: 福利四区| 无码国产精品久久一区免费 | 伊人久久91 | 毛片大全免费 | 性爱国产精品福利 | 国产欧美一区二区三区免费看 | 国产三级农村妇女在线播放 | 手机在线视频一区 | 成人国内精品视频在线观看 | 国产黄色亚洲 | AV无码岛国免费动作片 | 香蕉大美女天天爱天天做 | 天天爽亚洲中文字幕 | 干美女av | 美女超碰在线 | 免费在线成人影院 | 蜜臀久久99精品久久久久久9 | 综合在线国产 | 一级黄色带 | 一区二区三区手机在线观看 | 亚洲成A人片在线观看无码3D | 国产最顶级的黄色片在线免费观看 | 欧美阿v天堂 | 日本wwww视频 | 中文字幕手机在线观看 | 91精品国产综合久久久蜜臀图片 | 插插插精品亚洲一区 | jizz日本18 | 国产精品香蕉人多人在线观看 | 国产精品免费久久久久影视 | 国产和日产视频免费观看 | 国产影视精品一区二区三区 | 男女啪啪激烈高潮喷出动态图 | 精品久久久中文字幕 | 最新av在线播放 | 国产在线看片无码人精品 | 无码韩国三级理论在线观看 | 今天高清视频在线观看视频 | 77777_亚洲午夜久久多人 | 白丝无内液液酱夹腿自慰 | 特级黄色一级播放 |